Stantec Consulting

Substation Electrical Engineer (Energy)

Pune, India In person Full-time

Person Specifications

General Experience/Skills

National Fire Protection Association (NFPA) specification experience (familiarity with standards and experience working with them for site layout design). Specifically related to:

NFPA 70 – National Electric Code

NFPA 497

Knowledge of International standards like ISA, BS, IEC, NEMA, CEC, IEEE/ANSI

General Electrical/process experience & skills (specifying/purchasing/drawing reviews/etc.):

Transformer

Breakers

Disconnect switches

Surge Arrester

Voltage Transformers

Gas Insulated Switchgears (GIS)

Medium / Low Voltage Switchgears

Generator etc.

Control Building Design

GIS Building Design

  • Drawing development, Substation layout & Details
  • Single line diagrams & Protection Single Line diagrams
  • Equipment layout Plan and Elevations
  • Installation Drawings with Complete equipment’s part codes
  • Control / Switchgear / GIS Building Design
  • Grounding/Earthing and Lightning Protection layouts
  • Lighting layouts
  • Cable tray and trenches layouts etc.
  • Civil & Structural Drawings Review with Electrical Drawings

Design Calculations / Studies

Grounding calculations Using IEEE Std & IEC Standards

Lightening Protection Calculations

Lighting/Illumination Calculations

Sag & Tension Calculations

Cantilever Strength Calculations for Complete Yard Equipment’s

Cable Sizing & Conduit Sizing Calculations

Auxiliary (AC/DC) Sizing calculations

Cable Pulling Calculations

  • Cable Trench & Tray Calculations for Complete Building and Outdoor Yards
  • Bill of Materials Preparation for Complete Substation with Proper Supplier codes
  • Knowledge of 2D and 3D drafting software such as AutoCAD, REVIT, Plant 3D. Bentley MicroStation.
  • Have excellent data manipulation abilities (MS Excel/MS Access database type packages)
  • Technical report & Equipment’s Specification writing skills as per Project Requirements.
  • Self-starter, proactive, motivated person who can grab projects and work with the wider team to deliver.
  • Able to prioritize workloads whilst maintaining strong and trusting working relationships with Clients' and colleague's both locally and across the broader Stantec team.
  • Competent level of baseline skills, i.e., professional, and confident with the essential, basic business and communication skills that are required for career growth in all positions.
  • Rigorous attention to detail, able to understand and adopt workflows and commitment to personal professional development.
  • Flexible attitude to accepting different work assignments and pro-active attitude to execution / delivery.

Key Accountabilities

  • Electrical equipment sizing, calculations, and selection
  • Lighting and earthing Calculation
  • Preparation of technical specifications, reports, schedules, data sheets and deliverables
  • Preparation of General Arrangement drawings
  • Complete Control Building and GIS Building Design
  • Preparation/review of Bid analysis & Vendor/Supplier documents Review
  • Condition assessment
  • Preparation of Bill of Quantities
  • Conduit development
  • Carry out other duties as may be assigned from time to time by supervisor/management,
  • Need to work off-hours for client co-ordination: Occasionally
  • Need to travel offshore for training / on-site work: Occasionally

Specific Experience

  • Bachelor/ master’s degree in Electrical engineering.
  • 7 to 10 years of experience in Electrical Substation for Both AIS & GIS Stations, Renewable energy.
  • Experience in with balance of plant related activities such as Sub-station, Material handling.
  • Experience in Co-ordination with Customer and Suppliers.
  • Experience in System Studies & Primary, Secondary Knowledge in substation design.
  • Experience in Electrical Equipment sizing, Cable sizing.
  • Experience in preparation of Bill of Material for Complete Substation with proper. Components / Equipment selection as per Customer Specification and Requirements.

Job description provided by Stantec.
View the original posting