Industrial performance analysis
Sketch a value-stream map for a fictional production line. Identify a bottleneck, compare two improvement scenarios and estimate their capital and operating costs.
The Industrial Performance Project Manager maps production flows, detects bottlenecks and validates scenarios with modelling and CAPEX/OPEX estimates.
Source posting