Construction document review
Prepare a short walkthrough of how you would identify a coordination or constructability issue in a set of drawings and specifications. Practice describing the severity and cost of a missed issue.
The AEC Specialist role requires knowing what a real construction issue looks like and what a false positive costs a project team.
Source posting