Cloud troubleshooting and change control
Draw an EKS application's path to an external service. Work through a fictional connectivity failure involving DNS, routing or TLS, then write a change plan with rollback steps and validation evidence.
The infrastructure role troubleshoots ingress and connectivity and requires rollback planning and post-change validation.
Source posting