Manufacturing schedule recovery
Build a small resource-loaded production schedule. Introduce a material delay and a work-center bottleneck, then compare two recovery plans and explain their staffing implications.
The Integrated Scheduler role includes critical-path analysis, recovery planning, and resource-capacity modeling.